GSA Contract Info
 
Project Profile
Rotor Assembly for 600 Hz Fermi Chopper

Summary: MSC recently completed a feasibility study on a design, production and testing of a rotor assembly for a 600 Hz Fermi Chopper using advanced materials. We were able to identify materials and configurations that show promise of meeting the Fermi Chopper performance requirements. Because of the nature of composite materials, validating the candidate configurations required carrying the designs to a high-level of completion, and performing detailed stress analysis.

Images

Return to Concept Development And Requirements Analysis Services

[ TOP ]
All Right Reserved © 2002 Materials-Sciences.com